After the concrete was poured they started working on the framing (12/18/12).
And the roof. (12/21/12) This is what you would see looking out our kitchen window.
The girls love checking everything out.
The guys finishing up the roof and you can also see the small bathroom that is now enclosed. (1/3/13)
The stonework is so beautiful.
The company stopped working on the pool when we began working on the cabana so the pool has not been plastered and our backyard has not been graded. So when it rains consistently for an entire day we have a problem. Our yard wasn't draining correctly and the pool was almost completely full by morning. (1/8/13)
There was also a ton of water building up on the side of our house. If there is a natural disaster (tornado, flood, etc.) we can always depend on the Donaho's. David called Zane at 11pm and without hesitation he said he'd be there in 5 with his waders and a shovel. The boys worked for over an hour digging a trench and blocking off our air conditioners. If they had not done all that our house probably would have flooded. Thanks again buddy!!!
Looking pretty good. (1/12/13)
Sunday, January 13, 2013
Subscribe to:
Post Comments (Atom)


2 comments:
Thank goodness for Zane!, Cant wait for it to be finished. It is going to be awesome.
Gigi
I love that picture of them working. Guys never grow up, though...I think they liked digging in the mud! :)
Post a Comment